Another bloom is on the rise, Magnolia at Larossa In Capitol Hills. With the ongoing full-blast construction, we are pleased to provide the following updates as of August 2017:

Building Construction Progress : 18.76%

Actual Photos of Magnolia as of August 17, 2017

Actual Photos of Magnolia as of August 17, 2017

Construction Highlights & Activities: 
Magnolia construction is currently up to the 3rd floor already. Below are the updated construction per floor:

BASEMENT

Structural:

a. Concrete pouring of elevator wall basement to ground soffit

a. Concrete pouring of elevator wall basement to ground soffit

 

GROUND FLOOR

Electrical:

a. Box Setting

a. Box Setting

b. Roughing ins of lighting, power and auxiliary

b. Roughing ins of lighting, power and auxiliary

Structural:

a. Installation of forms and rebar

a. Installation of forms and rebar

b. Concrete pouring on slab

b. Concrete pouring on slab

Plumbing and Sanitary:

c. Concrete pouring on slab near elevator

c. Concrete pouring on slab near elevator

a. Installation of stub outs

a. Installation of stub outs

c. Installation of embedded waterline pipe

c. Installation of embedded waterline pipe

2nd FLOOR

a. Installation of rebar at slab

a. Installation of rebar at slab

b. Installation of rebar at slab

b. Installation of rebar at slab

3rd FLOOR

Structural:

a. Installation of rebar at slab

a. Installation of rebar at slab

b. Concrete pouring of slab

b. Concrete pouring of slab

c. Installation of rebar at walls

c. Installation of rebar at walls

 

Plumbing and Sanitary

a. Installation of stub outs

a. Installation of stub outs

 