Sustainable community

Camia, the first edifice in the  urban botanical community, is currently ready for occupancy. Larossa is part of the portfolio of Primehomes Real Estate Development Inc. (Primehomes), a developer that specializes in sustainable communities. 

Sampaguita Construction Bulletin - August 2017

Another bloom is on the rise, Sampaguita at Larossa In Capitol Hills. With the ongoing full-blast construction, we are pleased to provide the following updates as of August 2017:

Building Construction Progress : 19.66%

Actual Photos of Sampaguita as of August 17, 2017

Actual Photos of Sampaguita as of August 17, 2017

Construction Highlights & Activities: 
Sampaguita construction is currently up to the 5th floor already. Below are the updated construction per floor:

GROUND FLOOR

Architectural:

a. a.CHB Laying at T&B Wall

a. a.CHB Laying at T&B Wall

b. Concrete Pouring of T&B CHB Wall Zocalo

b. Concrete Pouring of T&B CHB Wall Zocalo

c. Plastering

c. Plastering

d. Smooth Rubbed Finishing

d. Smooth Rubbed Finishing

e. Rebar Installation & Zocalo Concrete Pouring

e. Rebar Installation & Zocalo Concrete Pouring

5th FLOOR:

Mechanical:

a. Installation of 150mmØ pipe sleeves for exhaust

a. Installation of 150mmØ pipe sleeves for exhaust

Plumbing and Sanitary:

a. Installation of stub outs

a. Installation of stub outs

b. Installation of embedded waterline pipes

b. Installation of embedded waterline pipes

c. Installation of pipe sleeves at Water meter center

c. Installation of pipe sleeves at Water meter center

d. Installation of 25mmØ equipment drains

d. Installation of 25mmØ equipment drains

Structural:

a. Installation of rebars on shear wall

a. Installation of rebars on shear wall

b. Installation of block out and forms on shear wall

b. Installation of block out and forms on shear wall

c. Installation of rebars on elevator shaft

c. Installation of rebars on elevator shaft

d. Installation of forms on slab

d. Installation of forms on slab

e. Concrete pouring of shear wall

e. Concrete pouring of shear wall

Electrical:

a. Box setting of power, auxiliary and switch

a. Box setting of power, auxiliary and switch

Visit our website every month for construction updates. Should you have further inquiries & concerns,  you may contact us at 02  617 5245 / 0917 705 3109. Thank you for your support.

Like us on Facebook: https://www.facebook.com/larossacapitolhillsOfficial/

Magnolia Construction Bulletin - August 2017

Another bloom is on the rise, Magnolia at Larossa In Capitol Hills. With the ongoing full-blast construction, we are pleased to provide the following updates as of August 2017:

Building Construction Progress : 18.76%

Actual Photos of Magnolia as of August 17, 2017

Actual Photos of Magnolia as of August 17, 2017

Construction Highlights & Activities: 
Magnolia construction is currently up to the 3rd floor already. Below are the updated construction per floor:

BASEMENT

Structural:

a. Concrete pouring of elevator wall basement to ground soffit

a. Concrete pouring of elevator wall basement to ground soffit

 

GROUND FLOOR

Electrical:

a. Box Setting

a. Box Setting

b. Roughing ins of lighting, power and auxiliary

b. Roughing ins of lighting, power and auxiliary

Structural:

a. Installation of forms and rebar

a. Installation of forms and rebar

b. Concrete pouring on slab

b. Concrete pouring on slab

Plumbing and Sanitary:

c. Concrete pouring on slab near elevator

c. Concrete pouring on slab near elevator

a. Installation of stub outs

a. Installation of stub outs

c. Installation of embedded waterline pipe

c. Installation of embedded waterline pipe

2nd FLOOR

a. Installation of rebar at slab

a. Installation of rebar at slab

b. Installation of rebar at slab

b. Installation of rebar at slab

3rd FLOOR

Structural:

a. Installation of rebar at slab

a. Installation of rebar at slab

b. Concrete pouring of slab

b. Concrete pouring of slab

c. Installation of rebar at walls

c. Installation of rebar at walls

 

Plumbing and Sanitary

a. Installation of stub outs

a. Installation of stub outs

 

Visit our website every month for construction updates. Should you have further inquiries & concerns,  you may contact us at 02  617 5245 / 0917 705 3109. Thank you for your support.

Like us on Facebook: https://www.facebook.com/larossacapitolhillsOfficial/

Camia Construction Updates

It's beginning to look alot like HOME...

'coz it's true when they say, HOME is where the HEART is 

Happy Valentines Day everyone!

 

Ongoing Punchlisting

Welcome to #Camia, the first bloom at #LarossaInCapitolHills.

We are pleased to inform that punchlisting has recently started and is currently ongoing. In line with this, we are currently organizing and coordinating respective schedules to ensure maximized assistance for every unit owners. Kindly expect a call from our After Sales Specialists to arrange your preferred schedule at your convenience.

Have a wonderful day!

After Sales Department
Larossa in Capitol Hills

#Punchlisting #Larossa #Camia #LarossaAfterSales#TheUrbanBotanicalCommunity

2.jpg

Camia Construction Updates

Happy New Year dear clients. We are pleased to inform you that punchlisting of all units and common areas with the Primehomes Construction group is ongoing. While the swimming pool is currently under construction, our landscape contractor already started planting trees and shrubs around the gazebo and entrance lobby. Exterior works is nearing completion with the ongoing installation of roof eaves and decorative supports. In a month's time, expect updates on the construction of the Sampaguita and Magnolia buildings. #LarossaInCapitolHills

Construction Bulletin

April 2015

Camia Building:
For the first time, Camia starts to show its shining beauty, having much of its painting works done; glazing, roofing and balcony railing installed. Interior finishing and utility works also in impressive progress.

Sampaguita Building:
Progressive structural works on foundations, basement walls and preparation for slab on grade, Sampaguita continues to rise above grade.

Magnolia Building:
Excavation and earthmoving almost completed as the site is being prepared for its bored piling and foundation works.